Turnpikes Projects
The NHDOT Turnpike's Replacement & Renewal (R&R) Programs are list below.
2022 R&R Projects
-
Project: Turnpike Drainage
-
Project Number: 40042
- Description: Statewide Turnpike Drainage Repair - Dover Exit 9, Nashua Exit 1, Rochester US 202
- Project: North Hampton
- Project Number: 42979
- Description: North Hampton #078/070 (I95 Exit 2 Ramp Bridge) Rehab
- Project: Nashua-Hooksett-Hampton
- Project Number: 42116 (81144)
- Description: Salt Shed Asphalt Roof Replace
- Project: Portsmouth-Kittery
- Project Number: 16189B
- Description: I-95 ITS Shoulder use project with Maine DOT and Turnpike
- Project: Central Turnpike Paving
- Project Number: 42263
- Description: I-93 mm 31.0 to mm 34.85 NB/SB, Hooksett ORT lanes, Spot Inlays on Circumferential, Exit 8 in Nashua
- Project: Eastern Turnpike Paving
- Project Number: 42264
- Description: I-95 mm 6.65 - mm 12.1 NB, 12.1-7.1 SB; I-95 Exit 1 NB Off Approach; I-95 Exit 90 SB Off Approach (up until Mass State Line)
- Project: Statewide Striping
- Project Number: 42265
- Description: Striping along all Turnpike facilities
- Project: Statewide Signal Project
- Project Number: 43762
- Description: Concord I-93 Exit 13 Signal and Rochester Traffic counters repairs
- Project: North Hampton
- Project Number: 42269
- Description: I-95 Bridge Painting (079/079 and 081/093)
- Project: Statewide ATMS
- Project Number: TBD
- Description: ATMS Upgrade along Blue Star and Spaulding Turnpike
- Project: Hooksett TBD
- Project Number: TBD
- Description: Median Guardrail replacement with barrier
- Project: Hampton-North Hampton-Portsmouth
- Project Number: 42115
- Description: Hi-mast light replacement with LED lighting at Exits 2, 3 and 4 interchanges of I-95
- Project: North Hampton
- Project Number: TBD
- Description: North Hampton Bridge 078/070 Deck replacement
- Project: Eastern Tpk Drainage Repair
- Project Number: 40042
- Description: Eastern Turnpike Drainage Repair
- Project: Statewide Exit Signing (Turnpikes)
- Project Number: TBD
- Description: Transition of Exit Signing to MM Basis along all Turnpike facilities
- Project: Statewide Toll Booth Rehabilitation
- Project Number: TBD
- Description: Rehabilitation of Toll Booths at Turnpikes Plazas
2023 R&R Projects
- Project: Statewide Bridge Painting
- Project Number: 43298
- Description: Greenland - Breakfast Hill Road (#128/078)
- Project: Portsmouth-Kittery
- Project Number: 16189B
- Description: I-95 ITS Shoulder use project with Maine DOT and Turnpike
- Project: Eastern TPK Statewide ITS
- Project Number: 42934
- Description: Replace Three (3) DMS; NH 1011 EB MM 130.1, Spd Tpke Portsmouth NB MM .09 and Dover SB MM 7.7
- Project: Guardrail X-Lite
- Project Number: blank
- Description: Guardrail -X-Lite End Unit Replacement
- Project: North Hampton
- Project Number: 42979
- Description: North Hampton #078/070 (I95 Exit 2 Ramp Bridge) Rehab
- Project: Central Turnpike Paving
- Project Number: 43301
- Description: Circumferential Hwy, Exit 1 & 2 in Nashua, Exit 7 Park n Ride
- Project: Eastern Turnpike Paving
- Project Number: 43300
- Description: Spaulding mm 20.4-23 NB/SB and Exits 14-16
- Project: Statewide Striping
- Project Number: 43302
- Description: Striping along all Turnpike facilities
- Project: Turnpike Drainage
- Project Number: 43303
- Description: Inlet/Outlet Reconstruction and Sliplining at several locations - Rochester US 202
- Project: Statewide Guardrail
- Project Number: 43304
- Description: Tpk Guardrail Replacement - Rochester Route 202
- Project: Hampton/Portsmouth
- Project Number: 43305
- Description: Replacement of High Mast Lighting Hampton/Portsmouth
- Project: Statewide
- Project Number: 43306
- Description: Hampton Side Toll Plaza Rehab
Below is the status report for the Program.
Turnpike's Replacement and Renewal Program Annual Report and Status Update